We provide INSTALLATION, REPAIR services for the entire range of ventilation, climate control, humidification, air conditioning systems, and commercial and industrial condensing units, both under warranty and post-warranty, based on order or service contract.
Below you will find the Labor/Service Price Table.
The prices are for informational purposes only.
For more details and a personalized offer, please contact us at:
Phone: 0746391858, 0745008728
Fax: 0213693230
Email: coldtechserv@gmail.com
|
Service description |
Net Price per Hour |
Maximum Standard Time |
||
(RON) |
/(H) |
||||
1 |
Refrigeration Compressor Replacement < 50 kg, Max. Height 3m |
245 |
|
2 | |
2 |
Refrigeration Compressor Replacement < 150 kg, Max. Height 3m |
320 |
|
2 | |
3 |
Condensing Unit Installation < 75 kg, Max. Height 3m |
380 |
|
2 | |
4 |
Condensing Unit Installation < 200 kg, Max. Height 3m |
410 |
|
3 | |
5 |
Air Cooler Installation < 60 kg, Max. Height 3m |
350 |
|
2 | |
6 |
Air Cooler Installation < 180 kg, Max. Height 3m |
385 |
|
2 | |
7 |
Refrigeration System Automation Panel Installation |
378 |
|
2 | |
8 |
Filter Drier Replacement < 650g with Refrigerant Recovery |
290 |
|
1 | |
9 |
Thermostatic Expansion Valve Replacement with Refrigerant Recovery |
295 |
|
1 | |
10 |
Solenoid Valve Replacement with Refrigerant Recovery |
290 |
|
1 | |
11 |
Solenoid Valve Coil Replacement |
150 |
|
1 | |
12 |
Straightening Refrigeration Condenser Fins / m² |
262 |
|
1 | |
13 |
Cleaning, Washing Refrigeration Condenser / m² |
180 |
|
1 | |
14 |
Complete Refrigeration System Installation < 10 kW, 4m line |
440 |
|
5 | |
15 |
Complete Refrigeration System Installation < 25 kW, 4m line |
474 |
|
6 | |
16 |
Cold Room Installation < 20 m³ |
450 |
|
11 | |
17 |
Cold Room Installation < 60 m³ |
435 |
|
16 | |
18 |
Refrigerant Recovery 20 kg/h |
370 |
|
1 | |
19 |
Vacuum, Charge System |
285 |
|
2 | |
20 |
Tests, Refrigeration System Adjustment |
275 |
|
2 | |
21 |
Travel Bucharest-Ilfov, Detailed Technical Diagnosis |
278 |
|
2 | |
22 |
Car Travel < 200 km, Issue Identification |
265 |
4 | ||
23 |
Van Travel < 200 km, Issue Identification |
290 |
|
5 | |
24 |
Electrical Connections, Wiring, Inspection |
250 |
|
2 |
|
25 |
Start-up, HVAC and Refrigeration System Adjustments |
480 |
|
1 |